Public project nonperformance in many developing nations including Ethiopia from different dimensions is obvious these days. For these different economic constraints, different industry related complications and higher rate of population growth mentioned as a cause. Specifically the provision of affordable housing for all classes of the society is very difficult scenario that the government is facing right now. The integrated saving housing development project in different parts of Addis Ababa city faces many different challenges due to many reasons and among those reasons implementation and interpretation of the project delivery method has its own negative impact. Having this background the study sets a general objective to assess overall impacts of the contract delivery method adopted for those mass housing projects in Addis Ababa city. The general objective addressed through three specific objectives aimed at assessing the delivery method’s; overall practice, advantages and disadvantages, its overall effectiveness and to specify the best delivery approach in the study area. Accordingly available literatures related with the topic were reviewed under the second chapter. A descriptive and exploratory research design preferred to address the different research objectives and a mixed research instrumentation and analysis technique implemented. Using those techniques the different findings from the questionnaire, interview and document analysis discussed accordingly. The finding from the analysis showed that Design-Bid-Build approach implemented in all sites housing projects for the different blocks characterized to be very customary, very fragmented and traditional which alters the ideal advantages of the system into disadvantages. Also the finding revealed that the Design-Bid-Build approach causes nonperformance of the project and affected the time constraints followed by risk and cost management of the project. Proper implementation and characterization and/or adaptation of the system will fits best the different policies and strategies by Minister of Urban Development and Housing. Finally significance of the study includes administrative, professional, academic and strategic assistance for the different concerned bodies in the construction industry.
Published in | American Journal of Engineering and Technology Management (Volume 6, Issue 6) |
DOI | 10.11648/j.ajetm.20210606.13 |
Page(s) | 105-116 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2021. Published by Science Publishing Group |
Government Housing Project, Performance, Project Delivery Method
[1] | A society of the American institute of architects, (2015). Understanding Project Delivery for the Design and Construction of Public Buildings. 275 Market Street, Suite 54 Minneapolis, MN 55405-1621. |
[2] | Abdissa Dessa, (2003). Claims in Ethiopian construction industry. pp. 55-67. |
[3] | Adiis Ababa City Administration, (2017). AddisAbaba.gov.et. Retrieved 08 27, 2019, from Addis Ababa city administration official web page: http://www.Addis Ababa. gov.et/de/web/guest/history. |
[4] | Alaeddin Ghadamsi & Nuhu Braimah, (2013). The influence of procurement methods on project performance: A conceptual framework. pp. 860-871. |
[5] | Endale Mamuye Desse, (2016). Identification of the Major Causes to the Delay in the Construction of 40/60 Saving Houses Project in Addis Ababa. Addis Ababa, Ethiopia. |
[6] | Frew Mengistu, (2018). Some Issues in Construction Project Management of the IHDP (Condominium). Addis Ababa: Ministry of Urban Development & Housing. |
[7] | Guesh Dejen, (2017). The Assessment of 20/80 Condominium Housing Projects in Addis Ababa: The case of Bole and Akaky Kaliti Sub cities. pp. 45-83. |
[8] | Jeffrey R. Appelbaum, (2012). Does It Really Matter? What Does the Project Delivery System Bring to the Success or Failure of the Project? Bellagio Hotel, Las Vegas, NV.: American Bar Association. |
[9] | Lema Mosissa, (2013). Alternative Project Delivery Methods for Public Constructions: Cases in Oromia Region. pp. 36-76. |
[10] | Luis Fernando Alarcón & Harrison Mesa, (2012). A modeling approach to understand performance of lean project delivery. Chile.: Pontificia Universidad Catolica de Chile. |
[11] | Mamaru Dessalegn Belay, (2017). Investigation of Major Success Factors on Building Construction Projects Management System in Addis Ababa, Ethiopia. American Journal of Civil Engineering. Vol. 5, No. 3, pp. 155-163. |
[12] | Melaku Alemayehu Yihun, (2017). The main causes of cost overrun on public housing programs in the case of Addis Ababa city administration. pp. 40-70. |
[13] | Miller John Brown, (2000). Towards a New Paradigm: Simultaneous Use of Multiple Project Delivery Methods. Journal of Management in Engineering, Vol. 16, No. 3, pp. 58-67. |
[14] | Nallaperumal, K., (2018). Engineering Research Methodology: A Computer Science and Engineering and Information and Communication Technologies Perspective. |
[15] | Rahel Tariku, (2016). Project Delivery Systems and Their Effects on Cost and Time Overrun On Ethiopian Road Authority Projects. pp. 39-68. |
[16] | Solomon S. Desta, (2015). The Management of Construction Processes in Developing Countries: A Case Study of the Ethiopian Roads Authority. pp. 218-235. |
[17] | Thomas E. Uher and Philip Davenport, (2002). Fundamentals of building contract mangement. UNSW Sydney NSW 2052: University of New South Wales Press Ltd. |
[18] | United Nations Human Settlements Programme (UN-Habitat). (2017). The state of 2017 the Addis Ababa we want. Addis Ababa, Ethiopia. |
[19] | Werku Koshe, (2016). Investigating Causes of Construction Delay in Ethiopian Construction Industries. Journal of Civil, Construction and Environmental Engineering. Vol. 1, No. 1, pp. 18-29. |
[20] | Wubishet Jekale Mengesha. (2009). Procurement & Contract Delivery Systems. |
[21] | Wubishet Jekale Mengesha. (2004). Performances of Public Construction Projects in (Least) Developing Countries: Road & Educational Building Projects in Ethiopia. NTNU: Norway. |
[22] | Yebichaye Dires, (2016). Building Defects due to Poor Workmanship in Addis Ababa, A Case Study on 20/80 Condominium Houses. Addis Ababa, Ethiopia. |
APA Style
Mikael Ketema Neserane. (2021). Assessment on Contract Delivery Methods Adopted for Public Projects in Addis Ababa: Special Emphasis for Government Housing Projects. American Journal of Engineering and Technology Management, 6(6), 105-116. https://doi.org/10.11648/j.ajetm.20210606.13
ACS Style
Mikael Ketema Neserane. Assessment on Contract Delivery Methods Adopted for Public Projects in Addis Ababa: Special Emphasis for Government Housing Projects. Am. J. Eng. Technol. Manag. 2021, 6(6), 105-116. doi: 10.11648/j.ajetm.20210606.13
AMA Style
Mikael Ketema Neserane. Assessment on Contract Delivery Methods Adopted for Public Projects in Addis Ababa: Special Emphasis for Government Housing Projects. Am J Eng Technol Manag. 2021;6(6):105-116. doi: 10.11648/j.ajetm.20210606.13
@article{10.11648/j.ajetm.20210606.13, author = {Mikael Ketema Neserane}, title = {Assessment on Contract Delivery Methods Adopted for Public Projects in Addis Ababa: Special Emphasis for Government Housing Projects}, journal = {American Journal of Engineering and Technology Management}, volume = {6}, number = {6}, pages = {105-116}, doi = {10.11648/j.ajetm.20210606.13}, url = {https://doi.org/10.11648/j.ajetm.20210606.13}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajetm.20210606.13}, abstract = {Public project nonperformance in many developing nations including Ethiopia from different dimensions is obvious these days. For these different economic constraints, different industry related complications and higher rate of population growth mentioned as a cause. Specifically the provision of affordable housing for all classes of the society is very difficult scenario that the government is facing right now. The integrated saving housing development project in different parts of Addis Ababa city faces many different challenges due to many reasons and among those reasons implementation and interpretation of the project delivery method has its own negative impact. Having this background the study sets a general objective to assess overall impacts of the contract delivery method adopted for those mass housing projects in Addis Ababa city. The general objective addressed through three specific objectives aimed at assessing the delivery method’s; overall practice, advantages and disadvantages, its overall effectiveness and to specify the best delivery approach in the study area. Accordingly available literatures related with the topic were reviewed under the second chapter. A descriptive and exploratory research design preferred to address the different research objectives and a mixed research instrumentation and analysis technique implemented. Using those techniques the different findings from the questionnaire, interview and document analysis discussed accordingly. The finding from the analysis showed that Design-Bid-Build approach implemented in all sites housing projects for the different blocks characterized to be very customary, very fragmented and traditional which alters the ideal advantages of the system into disadvantages. Also the finding revealed that the Design-Bid-Build approach causes nonperformance of the project and affected the time constraints followed by risk and cost management of the project. Proper implementation and characterization and/or adaptation of the system will fits best the different policies and strategies by Minister of Urban Development and Housing. Finally significance of the study includes administrative, professional, academic and strategic assistance for the different concerned bodies in the construction industry.}, year = {2021} }
TY - JOUR T1 - Assessment on Contract Delivery Methods Adopted for Public Projects in Addis Ababa: Special Emphasis for Government Housing Projects AU - Mikael Ketema Neserane Y1 - 2021/11/27 PY - 2021 N1 - https://doi.org/10.11648/j.ajetm.20210606.13 DO - 10.11648/j.ajetm.20210606.13 T2 - American Journal of Engineering and Technology Management JF - American Journal of Engineering and Technology Management JO - American Journal of Engineering and Technology Management SP - 105 EP - 116 PB - Science Publishing Group SN - 2575-1441 UR - https://doi.org/10.11648/j.ajetm.20210606.13 AB - Public project nonperformance in many developing nations including Ethiopia from different dimensions is obvious these days. For these different economic constraints, different industry related complications and higher rate of population growth mentioned as a cause. Specifically the provision of affordable housing for all classes of the society is very difficult scenario that the government is facing right now. The integrated saving housing development project in different parts of Addis Ababa city faces many different challenges due to many reasons and among those reasons implementation and interpretation of the project delivery method has its own negative impact. Having this background the study sets a general objective to assess overall impacts of the contract delivery method adopted for those mass housing projects in Addis Ababa city. The general objective addressed through three specific objectives aimed at assessing the delivery method’s; overall practice, advantages and disadvantages, its overall effectiveness and to specify the best delivery approach in the study area. Accordingly available literatures related with the topic were reviewed under the second chapter. A descriptive and exploratory research design preferred to address the different research objectives and a mixed research instrumentation and analysis technique implemented. Using those techniques the different findings from the questionnaire, interview and document analysis discussed accordingly. The finding from the analysis showed that Design-Bid-Build approach implemented in all sites housing projects for the different blocks characterized to be very customary, very fragmented and traditional which alters the ideal advantages of the system into disadvantages. Also the finding revealed that the Design-Bid-Build approach causes nonperformance of the project and affected the time constraints followed by risk and cost management of the project. Proper implementation and characterization and/or adaptation of the system will fits best the different policies and strategies by Minister of Urban Development and Housing. Finally significance of the study includes administrative, professional, academic and strategic assistance for the different concerned bodies in the construction industry. VL - 6 IS - 6 ER -