The project quality management system is a necessary process to ensure that the project would be executed has guaranteed quality system according to expectations and needs. An evaluation of quality management systems of ISO 9001:2008 series studied on contractor in Indonesia. As case study on PT Hutama Karya contractor for Six Senses Uluwatu Villa Resort Bali project. The execution was achieved by using a research instrument in the form of a checklist. A factor that becomes an obstacle in the implementation was obtained through observation, interview and verify documents of related staff. Assessment of the implementation of ISO 9001:2008 are clause 4, clause 5, clause 6, clause 7, and clause 8 is obtained by qualitative descriptive statistical analysis method, using audit score methods developed with rating measurement scale. Data analysis results can be categorized as very good with the percentage of 93.13%. The implementation level of the 4th clause, quality management system of 90.00% included in the category is very good. The implementation level of the 6th clause, management of resources of 91.76% is included in the very good category. The implementation level of the 7th clause, product realization of 93.33% is included in the very good category. The implementation level of the 8th clause i.g. measurement, analysis and improvement of 94.00% is categorized as very good. The 5th clause becomes the element that gets the highest score with the percentage of 96.25%. The 4th clause becomes the element with the lowest value with a percentage of 90.00%. Implementation has not reached 100% due to labor factor. Labor factor results in the emergence of another constraint factor such as documentation.
Published in | International Journal of Engineering Management (Volume 2, Issue 1) |
DOI | 10.11648/j.ijem.20180201.12 |
Page(s) | 8-14 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2018. Published by Science Publishing Group |
Evaluation, Implementation, ISO 9001:2008, Obstacles, Contractor, Villa Project
[1] | Anonimus. 2008. Sistem Manajemen Mutu – Persyaratan SNI ISO 9001: 2008. Badan Standarisasi Nasional. |
[2] | Gaspersz, V. 2006. ISO 9001:2000 and Continual Quality Improvement, Jakarta: PT. Gramedia Pustaka Utama. |
[3] | Mulia, T. G. M. 2011. Implementasi Sistem Manajemen Mutu ISO 9001:2008 pada Perusahaan Jasa Konstruksi. (Tugas Akhir yang tidak dipublikasikan, Jurusan Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta 2011). |
[4] | Pamulu, M. S. 2005. Studi Implementasi ISO 9000: 2000 pada Perusahaan Konstruksi di Makassar, Jurnal Teknik Sipil. Vol. 12, No. 3 Juli 2005. |
[5] | Putra, I. G. N. N. A. 2015. Implementasi Sistem Manajemen Mutu ISO 9001:2008 PT Waskita Karya pada Proyek Pembangunan Gedung Blok E RSUD Kabupaten Badung. (Tugas Akhir yang tidak dipublikasikan, Jurusan Teknik Sipil Fakultas Teknik Universitas Udayana 2015). |
[6] | Suardi, R. 2003. Sistem Manajemen Mutu ISO 9000:2000, PPM, Jakarta. |
[7] | Sugiyono, 2009. Metode Penelitian Kuantitatif, Kualitatif, dan R&D, Bandung: Alfabeta |
[8] | Pangemanan, D.G.G., Tarore, H.2013. Faktor-Faktor Yang Mempengaruhi Efektifitas Penerapan Manjemen Mutu ISO 9001:2008 Pada Perusahaan Kontraktordi Kota Manado. Jurnal Ilmiah Media Engineering Vol. 3, No. 1, Maret 2013, ISSN 2087-9334 pages: 49-53. |
[9] | Santosa, M.A.W., Widhiawati, I.A.R., Gede Astawa Diputra G.A. 2013. Penerapan Standar Sistem Manajemen Mutu (ISO) 9001:2008 Pada Kontraktor PT. Tunas Jaya Sanur. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil, Volume 2, No. 1, Pebruari 2013. |
[10] | Thilakarathne, P.M.C., Chithrangani S. K. C. 2014. A Study on Analysis of Managerial Attitudes towards ISO 9001: 2008 Quality Management System Introduction and Implementation Process in Sri Lanka. International Journal of Economics, Finance and Management Sciences, Volume 2, Issue 2, April 2014, Pages: 123-131 |
[11] | Artha, P.G.B., Adnyana, I. B.R., Widhiawati I.A.R., 2013. Implementasi Sistem Manajemen MISO 9001:2008 pada proyek Alaya Resort Ubud. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil, Volume 2, No. 1, Pebruari 2013 |
APA Style
Dewa Ketut Sudarsana, Putu Ari Sanjaya, Made Mahat Budhi Adnyana. (2018). An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project. International Journal of Engineering Management, 2(1), 8-14. https://doi.org/10.11648/j.ijem.20180201.12
ACS Style
Dewa Ketut Sudarsana; Putu Ari Sanjaya; Made Mahat Budhi Adnyana. An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project. Int. J. Eng. Manag. 2018, 2(1), 8-14. doi: 10.11648/j.ijem.20180201.12
AMA Style
Dewa Ketut Sudarsana, Putu Ari Sanjaya, Made Mahat Budhi Adnyana. An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project. Int J Eng Manag. 2018;2(1):8-14. doi: 10.11648/j.ijem.20180201.12
@article{10.11648/j.ijem.20180201.12, author = {Dewa Ketut Sudarsana and Putu Ari Sanjaya and Made Mahat Budhi Adnyana}, title = {An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project}, journal = {International Journal of Engineering Management}, volume = {2}, number = {1}, pages = {8-14}, doi = {10.11648/j.ijem.20180201.12}, url = {https://doi.org/10.11648/j.ijem.20180201.12}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ijem.20180201.12}, abstract = {The project quality management system is a necessary process to ensure that the project would be executed has guaranteed quality system according to expectations and needs. An evaluation of quality management systems of ISO 9001:2008 series studied on contractor in Indonesia. As case study on PT Hutama Karya contractor for Six Senses Uluwatu Villa Resort Bali project. The execution was achieved by using a research instrument in the form of a checklist. A factor that becomes an obstacle in the implementation was obtained through observation, interview and verify documents of related staff. Assessment of the implementation of ISO 9001:2008 are clause 4, clause 5, clause 6, clause 7, and clause 8 is obtained by qualitative descriptive statistical analysis method, using audit score methods developed with rating measurement scale. Data analysis results can be categorized as very good with the percentage of 93.13%. The implementation level of the 4th clause, quality management system of 90.00% included in the category is very good. The implementation level of the 6th clause, management of resources of 91.76% is included in the very good category. The implementation level of the 7th clause, product realization of 93.33% is included in the very good category. The implementation level of the 8th clause i.g. measurement, analysis and improvement of 94.00% is categorized as very good. The 5th clause becomes the element that gets the highest score with the percentage of 96.25%. The 4th clause becomes the element with the lowest value with a percentage of 90.00%. Implementation has not reached 100% due to labor factor. Labor factor results in the emergence of another constraint factor such as documentation.}, year = {2018} }
TY - JOUR T1 - An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project AU - Dewa Ketut Sudarsana AU - Putu Ari Sanjaya AU - Made Mahat Budhi Adnyana Y1 - 2018/04/08 PY - 2018 N1 - https://doi.org/10.11648/j.ijem.20180201.12 DO - 10.11648/j.ijem.20180201.12 T2 - International Journal of Engineering Management JF - International Journal of Engineering Management JO - International Journal of Engineering Management SP - 8 EP - 14 PB - Science Publishing Group SN - 2640-1568 UR - https://doi.org/10.11648/j.ijem.20180201.12 AB - The project quality management system is a necessary process to ensure that the project would be executed has guaranteed quality system according to expectations and needs. An evaluation of quality management systems of ISO 9001:2008 series studied on contractor in Indonesia. As case study on PT Hutama Karya contractor for Six Senses Uluwatu Villa Resort Bali project. The execution was achieved by using a research instrument in the form of a checklist. A factor that becomes an obstacle in the implementation was obtained through observation, interview and verify documents of related staff. Assessment of the implementation of ISO 9001:2008 are clause 4, clause 5, clause 6, clause 7, and clause 8 is obtained by qualitative descriptive statistical analysis method, using audit score methods developed with rating measurement scale. Data analysis results can be categorized as very good with the percentage of 93.13%. The implementation level of the 4th clause, quality management system of 90.00% included in the category is very good. The implementation level of the 6th clause, management of resources of 91.76% is included in the very good category. The implementation level of the 7th clause, product realization of 93.33% is included in the very good category. The implementation level of the 8th clause i.g. measurement, analysis and improvement of 94.00% is categorized as very good. The 5th clause becomes the element that gets the highest score with the percentage of 96.25%. The 4th clause becomes the element with the lowest value with a percentage of 90.00%. Implementation has not reached 100% due to labor factor. Labor factor results in the emergence of another constraint factor such as documentation. VL - 2 IS - 1 ER -