Civil engineering project completion within predetermined time schedule is usually the desire of the client and every other stakeholder. This has been a mirage because project in this case often fails to meet time target as a result of challenges emanating from its various peculiar characteristics. Civil engineering project completion within estimated time target can be achieved by adopting appropriate contractors’ selection criteria. This research therefore reflected Quantity Surveyors’ and Civil/Structural Engineers’ perception on the relevance of contractors’ prequalification criteria to time performance of civil engineering project. The purpose was to determine the impact of contractors’ selection criteria on time performance of civil engineering project, revealed the contractor prequalification criteria impacting most on time performance of civil engineering project. The primary data used were obtained from construction professionals in consulting, client and contracting organizations engaging in both private and public projects through a well designed questionnaire. Regression analysis and Karl Pearson’s coefficient of correlation were employed to evaluate the impact as well as relationship between contractors’ prequalification criteria and time performance of civil engineering project. Contractors’ prequalification criteria had both positive and negative relationship with time performance of civil engineering project at varying degree of significance. Also, contractors’ prequalification criteria significantly impact on and differently predict time performance of civil engineering project. Therefore, prioritizing reputation and past performance as well as strict adherence to the impact order of the set of criteria for contractors’ prequalification listed in this study would lead to achievement of civil engineering project that meet time target.
Published in | American Journal of Civil Engineering (Volume 4, Issue 5) |
DOI | 10.11648/j.ajce.20160405.13 |
Page(s) | 225-232 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2016. Published by Science Publishing Group |
Contractor, Prequalification, Contractors’ Prequalification Criteria, Time Performance, Civil Engineering Project, Relationship, Relevance, Impact
[1] | Ojo, S. O. (2009). Benchmarking the performance of construction procurement methods against selection criteria Nigeria. Journal of Civil Engineering Dimension September, 2009. |
[2] | Civil Contractors federation (2010). Resourcing the future national resources sector employment task force discussion: 1-15. |
[3] | Pierre, D (2003, April 4-6). Risk in civil engineering from natural to man-made hazards. France-Stanford conference on risk issues in contemporary science and engineering; Stanford: 1-14. |
[4] | Lake, L. (2008). Civil Engineering; Microsoft Encarta. |
[5] | Oforeh, E. C. (2006). The Cost Management of Heavy Capital Projects. Vol. 1; Construction and Management. First Edition. Cosines Nig. Limited. 2006: 1-10. |
[6] | Barbara, J. J. (2004). Construction management jump start. London: San Francisco: 2-140. |
[7] | Salama, M; Abd, E. A; EL, S. H and El, S. A (2006, September 4-6). Investigating the Criteria for Contractors’ Selection and Bid Evaluation in Egypt. Conference proceeding of 22nd Association of Researchers in Construction Management. Birmingham, UK: 531-540. |
[8] | Ogunsemi D. R. and Aje I. O. (2005). A model for contractors Selection in Nigeria. The Quantity Surveyor 50 (1) 3-7 |
[9] | Puoy, P (2011). Contractor prequalification criteria, tendering criteria, and tendering procedure in Cambodia building and housing construction projects. Journal of professional project management education. |
[10] | Zavadskas, E. K; Vilutiene, T; Turskis, Z and Tamosaitiene, J (2010). Contractor Selection for Construction Works by Applying SAW-G and TOPSIS Grey Techniques and Management. |
[11] | Masamintsu, O; Khairuddin, A. R; Toshihiko, O. and Kiyoshi, K. (2003, August 18-19). A Comparative study on the standard forms of contract in Malaysia and Japan with specific reference to variation procedures. A paper presentation at the 2003 Quantity Surveyors National Conference at Sheraton Hotels and Tours, SubangJaya, Selengor, Malaysia. |
[12] | Slobodan, M (2006). Civil engineering projects realization management. Journal of Architecture and Civil Engineering 4 (2). |
[13] | Tran, M. T (2009). Project time and cost performance in water supply pipeline construction in Dong Nai Province, Vietnam. A system dynamics approach. Professional project management education. |
[14] | Ng, W. S. and Aminah, M. Y. (2006, September, 5-6). The selection factors of design and build procurement method; A literature visit; Conference proceedings of the 6th Asian-pacific structural engineering and construction (APSEC 2006), Kuala Lumpur, Malaysia. |
[15] | Rathsayam, T (2009). Factors affecting project delivery time delays and cost overruns of project development at the Royal irrigation department of Thaitan. Professional project management education. |
[16] | Azian, S., and Ismail, R. (2010). The performance measurement of construction projects managed by ISO-certified contractors in Malaysia. Journal of retail and leisure property 9: 25-35. |
[17] | Othman, A. A; Torraance, J. V. and Hamid, M. A. (2006). Factors influencing the construction of time of civil engineering projects in Malaysia. Journal of Engineering, Construction and Architectural Management, 13 (5): 481-501. |
[18] | Khamidi, F. M; Khan, A. W and Idrus, A. (2011). The cost monitoring of construction projects through earned value analysis. International conference in Economics and Finance Research IPEDR 4 IACSIT Press, Singapore. |
[19] | Ng, T. S. and Skitmore, M. R. and Lam, K. C and Poon, A. W. C (2004). Demotivating factors influencing the productivity of civil engineering projects. International Journal of Project Management 22 (2): 139-146. |
[20] | Arazi, I., Mahmoud, S., and Mohamad, H. (2011). Decision criteria for selecting main contractors in Malaysia. Research journal of applied engineering and technology 3 (12): 1358-1365 |
[21] | Udechukwu, E. C, and Iyagba, A. O (2008). Comparative Analysis of Construction Senarios in Japan and Nigeria. The Quantity Surveyor 55: 28-37. |
[22] | Nwosu, C. C. C. (2003). High Cost of Building in Nigeria. The Quantity Surveyor 44 (3). |
[23] | Onwusonye, S. I. J. (2002). The Role of Client’s in-house Professional in Capital Project Procurement and Delivery. The Quantity Surveyor. 38 (1). |
[24] | Nagarajan, K. K. (2012). Project management (6th edition): New Age International Publishers. |
[25] | Chitkara, K. K. (2011). Project management; Planning, scheduling and controlling (2nd edition). New Delhi: Tata Mcgraw Hill. |
[26] | Salter, A and Torbett, R (2003). Innovation and performance in engineering design. Journal of Construction management and economics, 21. |
[27] | Odeh, A. M.; and Battaineh, H. T. (2002). Causes of Construction Delays: Traditional Contracts. International journal of project management. 20 (1). |
[28] | Peek, B. V. (2006). Construction management: Choosing the best project delivery method; Construction management association of America. Retrieved from. http//www.emaanet.org/ |
[29] | Adnan, E., Sherif, M., and Saleh, M. (2009). Factors affecting the performance of construction projects in the Gaza strip. Journal of civil engineering and management 15 (3). |
[30] | Ajayi, O. M., and Ogunsanmi, O. E. (2012). Decision maker’s perceptions on contractor prequalification criteria. Journal of contemporary research in business 4 (6): 174-180. |
[31] | Xiaohong, H (2011). An analysis of the selection of project contractor in the construction management process. International journal of business and management, 6 (3): 184-189. |
[32] | Queensland (2007). Contractor prequalification criteria; Service risk assessment, Queensland government: 1-10. |
[33] | Aje, I. (2012). The impact of contractors’ prequalification on construction project delivery in Nigeria. Journal of engineering, construction and architectural management 19 (2): 159-171. |
[34] | Ng, T. S. and Skitmore, M. R. (2001). Contractor Selection Criteria: A cost Benefit Analysis. Journal of Engineering Management 48 (1). |
[35] | Nguyen, D. H. C. (2011). Owners tendering strategy to obtain a qualified contractor. Professional project management education. |
[36] | Kothari, C. R. (2004). Research methodology; Methods and techniques. New age international publishers. |
[37] | Charles, T. and Fen, Y. (2007). Mixed methods sampling: A typology with examples. Journal of mixed methods research, 1 (1). |
[38] | Fuziah, I., Muzani, M., and Fara, D. (2006). Risk factors of contractors’ corporate reputation, ICCI. |
[39] | Jeffrey, V; Emica, C; Pierluigi, C and Giancarlos, S. (2012). Reputation and entry. Retrieved from http://www.reputation_and_entry_may28pdf_ |
[40] | Msafiri, A. S. (2015). An investigation into factors causing delays in road construction projects in Kenya. American Journal of Civil Engineering 3 (3): 51-63. |
[41] | Aje, I. O., Odusami, K. T., and Ogunsemi, D. R. (2009). The impact of contractors’ management capability on cost and time performance of construction projects in Nigeria. Journal of financial management of property and construction 14 (2): 171-187. |
[42] | Pooria, R., Muhd, Z. A. M., Mahmoud, B., and Farzan, G. (2015). Contractor selection at prequalification stage: current evaluation and shortcomings. Jurnal Teknologi (Sciences & Engineering) 77 (16): 81–89. |
APA Style
Ologunagba Mulikat Modupe, Akinmusire Adeleye Ola. (2016). Relevance of Contractors’ Prequalification Criteria to Time Performance of Civil Engineering Project. American Journal of Civil Engineering, 4(5), 225-232. https://doi.org/10.11648/j.ajce.20160405.13
ACS Style
Ologunagba Mulikat Modupe; Akinmusire Adeleye Ola. Relevance of Contractors’ Prequalification Criteria to Time Performance of Civil Engineering Project. Am. J. Civ. Eng. 2016, 4(5), 225-232. doi: 10.11648/j.ajce.20160405.13
AMA Style
Ologunagba Mulikat Modupe, Akinmusire Adeleye Ola. Relevance of Contractors’ Prequalification Criteria to Time Performance of Civil Engineering Project. Am J Civ Eng. 2016;4(5):225-232. doi: 10.11648/j.ajce.20160405.13
@article{10.11648/j.ajce.20160405.13, author = {Ologunagba Mulikat Modupe and Akinmusire Adeleye Ola}, title = {Relevance of Contractors’ Prequalification Criteria to Time Performance of Civil Engineering Project}, journal = {American Journal of Civil Engineering}, volume = {4}, number = {5}, pages = {225-232}, doi = {10.11648/j.ajce.20160405.13}, url = {https://doi.org/10.11648/j.ajce.20160405.13}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajce.20160405.13}, abstract = {Civil engineering project completion within predetermined time schedule is usually the desire of the client and every other stakeholder. This has been a mirage because project in this case often fails to meet time target as a result of challenges emanating from its various peculiar characteristics. Civil engineering project completion within estimated time target can be achieved by adopting appropriate contractors’ selection criteria. This research therefore reflected Quantity Surveyors’ and Civil/Structural Engineers’ perception on the relevance of contractors’ prequalification criteria to time performance of civil engineering project. The purpose was to determine the impact of contractors’ selection criteria on time performance of civil engineering project, revealed the contractor prequalification criteria impacting most on time performance of civil engineering project. The primary data used were obtained from construction professionals in consulting, client and contracting organizations engaging in both private and public projects through a well designed questionnaire. Regression analysis and Karl Pearson’s coefficient of correlation were employed to evaluate the impact as well as relationship between contractors’ prequalification criteria and time performance of civil engineering project. Contractors’ prequalification criteria had both positive and negative relationship with time performance of civil engineering project at varying degree of significance. Also, contractors’ prequalification criteria significantly impact on and differently predict time performance of civil engineering project. Therefore, prioritizing reputation and past performance as well as strict adherence to the impact order of the set of criteria for contractors’ prequalification listed in this study would lead to achievement of civil engineering project that meet time target.}, year = {2016} }
TY - JOUR T1 - Relevance of Contractors’ Prequalification Criteria to Time Performance of Civil Engineering Project AU - Ologunagba Mulikat Modupe AU - Akinmusire Adeleye Ola Y1 - 2016/07/28 PY - 2016 N1 - https://doi.org/10.11648/j.ajce.20160405.13 DO - 10.11648/j.ajce.20160405.13 T2 - American Journal of Civil Engineering JF - American Journal of Civil Engineering JO - American Journal of Civil Engineering SP - 225 EP - 232 PB - Science Publishing Group SN - 2330-8737 UR - https://doi.org/10.11648/j.ajce.20160405.13 AB - Civil engineering project completion within predetermined time schedule is usually the desire of the client and every other stakeholder. This has been a mirage because project in this case often fails to meet time target as a result of challenges emanating from its various peculiar characteristics. Civil engineering project completion within estimated time target can be achieved by adopting appropriate contractors’ selection criteria. This research therefore reflected Quantity Surveyors’ and Civil/Structural Engineers’ perception on the relevance of contractors’ prequalification criteria to time performance of civil engineering project. The purpose was to determine the impact of contractors’ selection criteria on time performance of civil engineering project, revealed the contractor prequalification criteria impacting most on time performance of civil engineering project. The primary data used were obtained from construction professionals in consulting, client and contracting organizations engaging in both private and public projects through a well designed questionnaire. Regression analysis and Karl Pearson’s coefficient of correlation were employed to evaluate the impact as well as relationship between contractors’ prequalification criteria and time performance of civil engineering project. Contractors’ prequalification criteria had both positive and negative relationship with time performance of civil engineering project at varying degree of significance. Also, contractors’ prequalification criteria significantly impact on and differently predict time performance of civil engineering project. Therefore, prioritizing reputation and past performance as well as strict adherence to the impact order of the set of criteria for contractors’ prequalification listed in this study would lead to achievement of civil engineering project that meet time target. VL - 4 IS - 5 ER -