| Peer-Reviewed

Computer-Assisted Wiring Optimization Method for Photovoltaic Power Plant Area

Received: 22 July 2018     Accepted: 8 August 2018     Published: 10 September 2018
Views:       Downloads:
Abstract

At present, the system wiring method and construction in the photovoltaic power plant area are arbitrary and many design schemes reflect the designers' own habit. In addition, the economic benefit of different cable laying routes and method is not considered in the design stage. To solve these problems, the connection type, length proportion and cable specification of the primary system in the photovoltaic power plant area are scientifically optimized or selected and the expectation formulas of economic indicators for a variety of photovoltaic power stations are proposed on the basis of theoretical analysis; the mathematical and statistical calculation and enumeration method assisted with computer software are employed to obtain the recommended value of wiring lengths of various cables in this paper. Oriented to the three indicators in connection with cables, i.e. minimum installation cost, maximum total system revenue and minimum Levelized Cost of Energy (LCOE), and taking the selection specification, value and construction cost of cables as the input conditions, these expectation formulas can automatically generate the CAD wiring diagram and cable inventory according to the finally summarized computer operation logic diagram under the conditions where the corresponding computer software is obtained presumably, so that the technical data such as final output design drawing and cable inventory will be the most economic design scheme as expected by the formulas. Furthermore, in the process of theoretical analysis, some variables and principles present in the formulas are reasoned, calculated and demonstrated in a scientific way and the theoretical basis herein is improved accordingly. Introduction of theoretical formulas can guide the computer software developers to write programs for the schemes herein and finally work out cabling design software oriented for optimization of economic benefit for photovoltaic power plant areas.

Published in American Journal of Modern Energy (Volume 4, Issue 3)
DOI 10.11648/j.ajme.20180403.11
Page(s) 17-25
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2018. Published by Science Publishing Group

Keywords

Photovoltaic Power Plant Area, Wiring Length, Installation Cost, Total System Revenue, LCOE, Computer-Assisted

References
[1] V Parmar. Benefit Cost Analysis of Solar Power over On-Grid Electricity for Residential Systems: Is Photovoltaic Technology Really Effective? 2016.
[2] Sharma, Abhishek, Mahajan, Priya, Garg, Rachana. Performance and Cost Benefit Analysis of Solar Photovoltaic Power Plant for Delhi secretariat Building 2017.
[3] G Rachid, ME Fadel, MA Hindi, I Jamali, DA Nour. Indirect Solar Desalination: Value Engineering and Cost Benefit Analysis 2015.
[4] Sharma Abhishek, Mahajan Priya, Garg Rachana. Performance and Cost Benefit Analysis of Solar Photovoltaic Power Plant for Delhi secretariat Building 2018.
[5] GB 50797-2012 Code for Design of Photovoltaic Power Station [S].
[6] Yang S, Zhu X, Guo W. Cost-Benefit Analysis for the Concentrated Solar Power in China [J]. 2018.
[7] GB/T 31366-2015 Technical Requirements for Monitoring and Control System of Photovoltaic Power Station [S].
[8] GB/T 30153-2013 Technical Requirement for Solar Energy Resource Real-Time Monitoring of Photovoltaic Power Station [S].
[9] WANG, Chang-gui, WANG Si-cheng, Practical Technology of Solar Photovoltaic Power Generation (2nd Version) [M].
[10] PH Tan. Design and Performance Evaluation Of Solar PV System In Malaysia 2016.
Cite This Article
  • APA Style

    Chen Min. (2018). Computer-Assisted Wiring Optimization Method for Photovoltaic Power Plant Area. American Journal of Modern Energy, 4(3), 17-25. https://doi.org/10.11648/j.ajme.20180403.11

    Copy | Download

    ACS Style

    Chen Min. Computer-Assisted Wiring Optimization Method for Photovoltaic Power Plant Area. Am. J. Mod. Energy 2018, 4(3), 17-25. doi: 10.11648/j.ajme.20180403.11

    Copy | Download

    AMA Style

    Chen Min. Computer-Assisted Wiring Optimization Method for Photovoltaic Power Plant Area. Am J Mod Energy. 2018;4(3):17-25. doi: 10.11648/j.ajme.20180403.11

    Copy | Download

  • @article{10.11648/j.ajme.20180403.11,
      author = {Chen Min},
      title = {Computer-Assisted Wiring Optimization Method for Photovoltaic Power Plant Area},
      journal = {American Journal of Modern Energy},
      volume = {4},
      number = {3},
      pages = {17-25},
      doi = {10.11648/j.ajme.20180403.11},
      url = {https://doi.org/10.11648/j.ajme.20180403.11},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajme.20180403.11},
      abstract = {At present, the system wiring method and construction in the photovoltaic power plant area are arbitrary and many design schemes reflect the designers' own habit. In addition, the economic benefit of different cable laying routes and method is not considered in the design stage. To solve these problems, the connection type, length proportion and cable specification of the primary system in the photovoltaic power plant area are scientifically optimized or selected and the expectation formulas of economic indicators for a variety of photovoltaic power stations are proposed on the basis of theoretical analysis; the mathematical and statistical calculation and enumeration method assisted with computer software are employed to obtain the recommended value of wiring lengths of various cables in this paper. Oriented to the three indicators in connection with cables, i.e. minimum installation cost, maximum total system revenue and minimum Levelized Cost of Energy (LCOE), and taking the selection specification, value and construction cost of cables as the input conditions, these expectation formulas can automatically generate the CAD wiring diagram and cable inventory according to the finally summarized computer operation logic diagram under the conditions where the corresponding computer software is obtained presumably, so that the technical data such as final output design drawing and cable inventory will be the most economic design scheme as expected by the formulas. Furthermore, in the process of theoretical analysis, some variables and principles present in the formulas are reasoned, calculated and demonstrated in a scientific way and the theoretical basis herein is improved accordingly. Introduction of theoretical formulas can guide the computer software developers to write programs for the schemes herein and finally work out cabling design software oriented for optimization of economic benefit for photovoltaic power plant areas.},
     year = {2018}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Computer-Assisted Wiring Optimization Method for Photovoltaic Power Plant Area
    AU  - Chen Min
    Y1  - 2018/09/10
    PY  - 2018
    N1  - https://doi.org/10.11648/j.ajme.20180403.11
    DO  - 10.11648/j.ajme.20180403.11
    T2  - American Journal of Modern Energy
    JF  - American Journal of Modern Energy
    JO  - American Journal of Modern Energy
    SP  - 17
    EP  - 25
    PB  - Science Publishing Group
    SN  - 2575-3797
    UR  - https://doi.org/10.11648/j.ajme.20180403.11
    AB  - At present, the system wiring method and construction in the photovoltaic power plant area are arbitrary and many design schemes reflect the designers' own habit. In addition, the economic benefit of different cable laying routes and method is not considered in the design stage. To solve these problems, the connection type, length proportion and cable specification of the primary system in the photovoltaic power plant area are scientifically optimized or selected and the expectation formulas of economic indicators for a variety of photovoltaic power stations are proposed on the basis of theoretical analysis; the mathematical and statistical calculation and enumeration method assisted with computer software are employed to obtain the recommended value of wiring lengths of various cables in this paper. Oriented to the three indicators in connection with cables, i.e. minimum installation cost, maximum total system revenue and minimum Levelized Cost of Energy (LCOE), and taking the selection specification, value and construction cost of cables as the input conditions, these expectation formulas can automatically generate the CAD wiring diagram and cable inventory according to the finally summarized computer operation logic diagram under the conditions where the corresponding computer software is obtained presumably, so that the technical data such as final output design drawing and cable inventory will be the most economic design scheme as expected by the formulas. Furthermore, in the process of theoretical analysis, some variables and principles present in the formulas are reasoned, calculated and demonstrated in a scientific way and the theoretical basis herein is improved accordingly. Introduction of theoretical formulas can guide the computer software developers to write programs for the schemes herein and finally work out cabling design software oriented for optimization of economic benefit for photovoltaic power plant areas.
    VL  - 4
    IS  - 3
    ER  - 

    Copy | Download

Author Information
  • GCL Energy Engineering Co., Ltd. Suzhou, China

  • Sections